• Work
  • Process
  • Team

  • Work
  • Process
  • Team

HEADWATERS CAMP

project details
PROJECT DETAILS
architect

Dan Joseph Architects

photography

Audrey Hall

interior design

Carole Sisson Designs

engineer

Bridger Engineers

Year

2008

This LEED Platinum-certified property sprawls over 22 acres which effortlessly accommodate a love of equestrianism with amenities like a 1200 square foot horse barn equipped with round pen and lunging arena. This western camp abounds with an extensive trail network assembled for recreational use. The property’s greatest attribute is its application of sustainable design, the focal point being a geothermal heating system supported by an aquatic development of several ponds and streams which serve as the system’s thermal mass.

highlights
HIGHLIGHTS
2011 COWGIRL MAGAZINE
2010 BIG SKY JOURNAL- HOME OF THE YEAR
2010 MOUNTAIN LIVING- PERFECTING THE PAST
sustainability
SUSTAINABILITY
INTERIOR
  • High efficiency appliances
  • Extensive use of reclaimed materials
EXTERIOR
  • Geothermal pond plate system
  • 2010 USGBC LEED Platinum for Headwaters Camp Project

Navigation

Work
Process
Team

Information

Big Sky, MT 59716                                              PO BOX 161618                                                                                                                                                                                                                  getintouch@highline-partners.com

Main Office

Bozeman Branch

© Copyright Highline Partners 2020